Sunday, May 1, 2022

Another in-season project

 After the paver contractor installed the base material for the new driving range mats, it was our turn to get to work on this project.


As is often the case, things started off slowly, then we got into assembly line mode, the guys kept their heads down, and made quick work of this.


There is still some grading and paver work to be done here, but whenever needed, the mats are ready to be used.

No comments:

Post a Comment