The team tackled a good sized project this week on #8 bridge. The first part of this was installing an anti-slip matting down the center of the bridge. This material is held in place by screws and a whopping 36 tubes of adhesive.
Once this was completed, Trex decking was added on the sides of the matting. With close to 2,000 screws used to secure the decking in place, there were some sore backs after the guys got finished. We were able to catch their "good side" in the picture below:
It is a bit of a balancing act to take on something like this with the amount of activity on the golf course right now. Among other daily activities, we are mowing, raking, sweeping, filling divots, and watering sod. The guys did an amazing job getting this banged out in two days. The finished product provides a smoother and safer experience, whether you are riding or walking.