Saturday, January 23, 2021

Paving Project

A record number of rounds, and the fact that you can now get more than just water to drink when playing #6 or 14, has led to some serious traffic issues in this area over the last year.  We have recently done a couple of things to address the traffic damage on the right side of #6.  

First, we stripped the knob of the "not so fine-looking" Fine Fescue, then softened the mounding a touch, and resodded this to a Primary Rough sod.  The second improvement in this area was to have a pull off area paved.

With the paving contractor already working in the area, we had the path at #13 green and #14 tees resurfaced.  The beginning of this cart path was a real rollercoaster ride for their equipment, but the finished product will give you a smooth ride in your cart.  

The team will be finishing up some edge repairs, as the weather permits.